Shibuya Scramble Square Phase I (East Tower) to open in autumn 2019
"SHIBUYA QWS" event space (tentative name)
"SHIBUYA QWS" Town Hall (tentative name)
"SHIBUYA QWS" Salon (tentative name)
1st floor Urban Core (from the north side)
2nd floor Urban Core (from the entrance to the Hikarie connecting passage)
3rd floor Urban Core (from the west side)
Shibuya Scramble Square Phase I (East Tower) to open in autumn 2019
Shibuya Scramble Square Phase I (East Tower) to open in autumn 2019
Shibuya Scramble Square Phase I (East Tower) to open in autumn 2019